Loading...
HomeMy WebLinkAbout07-J - 2007 Water System Capital Improvement Project m CITY OF LIVONIAADVERTISEMENT FOR BIDS :\\ c WATER SYSTEM00030 / 1 o n CAPITAL IMPROVEMENT PROJECT t r a c t ADVERTISEMENT FOR BIDS a d WATER SYSTEM m i CAPITAL IMPROVEMENT PROJECT n i CITY OF LIVONIA s t r a ti Sealed proposals for the construction of the Water System Capital Improvement Project will be received by the o n City of Livoniaat the Livonia City Hall, 33000 Civic Center Drive, Livonia, Michigan until 2:00p.m., Local \\ 2 Time on Tuesday, June 12, 2007 at which time and place all bids will be publicly opened and read. 0 0 7 Bidders shall review and comply with the Instructions to Bidders, which are incorporated by reference, and \\ 0 carefully review all Contract Documents, as defined in the Instructions to Bidders. Bids submitted after the 7 - exact time specified for receipt will not be considered. j 2 0 The Contracts will consist of the following principal items of work and appurtenances as specified herein and 0 7 shown on the Contract Drawings. w a t e Description of Work r m a i Pipe Bursting Ex. Water Main & Install 8” W.M.5,691 lf n Pipe Bursting Ex. Water Main & Install 12” W.M.2,025 lf r e 8” Dia. D.I. Cl. 54 Water Main12,085 lf p l 12” Dia. D.I. Cl. 54 Water Main7,421 lf a c Install Hydrant Assembly58 ea e m 8” and 12” G.V. in W57 ea e n Tapping Sleeve & G.V. in W8 ea t p Connect Ex. Water Service Lead to New Water Main411 ea r o Saw Cut, Remove & Replace Bit. & Conc. Drive Approach5,960 sy g r Bore & Jack Water Main370 lf a m Remove& Replace Curb & Gutter1,950 lf \\ Remove & Replace Conc. Sidewalk3,150 sy a d Pipe Bursting Ex. Water Main and Install 8” Dia HDPE, SDR 11 Pipe v e (to be bid as alternate in lieu of installing W.M. by open cut methods) 16,676 lf r ti Pipe Bursting Ex. Water Main and Install 12” Dia. HDPE, SDR11 Water Main s e (to be bid as alternate in lieu of installing W.M. by open cut method)4,170 lf m e n t Copies of Plans and Specifications and Proposal Forms may be secured on or after May21,2007 at the offices f of Hubbell, Roth & Clark, Inc., Consulting Engineers, 555 Hulet Drive, Bloomfield Hills, Michigan 48302-0360. o r b i A non-refundable payment of Seventy-Five ($75.00) Dollars, CHECKONLY, payable to ``Hubbell, Roth & d s Clark, Inc.'' will be required for each set of Drawings and Specifications. Drawings and Specifications can be 0 7 shipped by U.P.S. ground for a shipping and handling charge of Ten ($10.00) Dollars, CHECKONLY, non- - j.refundable,to Hubbell, Roth & Clark, Inc. d o c Hubbell, Roth & Clark, Inc. Job 20060147 m CITY OF LIVONIAADVERTISEMENT FOR BIDS :\\ c WATER SYSTEM00030 / 2 o n CAPITAL IMPROVEMENT PROJECT t r a c t Proposals submitted by Contractors who have been debarred, suspended, or made ineligible by any Federal a d Agency will be rejected.Each bidder agrees to waive any claim it has or may have against the Owner, the m i Architect/Engineer, and their respective employees, arising out of or in connection with the administration, n i evaluation, or recommendation of any bid. s t r Four (4) copies of each bid proposal shall be submitted on the proposal forms provided and shall be a ti accompanied by a certified check, cashier's check or bid bond, executed by the bidder and Surety Company, o n payable to theCity of Livonia in the amount of five percent (5%) of the total bid. Proposal Guarantee shall \\ 2 provide assurance that the bidder will, upon acceptance of the bid, execute the necessary Contract with the 0 City. No bid may be withdrawn after scheduled closing time for receiving bids for at least one hundred twenty 0 7 (120)calendardays. \\ 0 7 - The successful bidder will be required to furnish satisfactory Performance, Labor and Material, and j 2 Maintenance and Guarantee Bonds.TheOwner reserves the right to reject all bids and to waive irregularities 0 in bidding. 0 7 w a City of Livonia t e r m Robert J. Schron, P.E. a City Engineer i n r e Jack Engebretson, Mayor p l CITY OF LIVONIA a c e m e n t p r o g r a m \\ a d v e r ti s e m e n t f o r b i d s 0 7 - j. d o c Hubbell, Roth & Clark, Inc. Job 20060147 DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION ROBERT J. SCHRON, P.E. JACK ENGEBRETSON City Engineer MAYOR JOHN P. HILL ROBERT J. BECKLEY, P.E. Asst. City Engineer Director of Public Works 33000 CIVIC CENTER DRIVE LIVONIA, MICHIGAN 48154-3097 (734) 466-2571 FAX: (734) 466-2195 Water System Capital Improvement Project Contract No. 07-G As-read bids taken June 12, 2007 ALT AALT B 1. Murphy Pipeline Contractors$2,791,562.50 2. Rico Excavating $2,996,543.00 3. Lawrence M. Clarke, Inc$3,150,835.00